WY Grant Program

Wyoming - National Electric Vehicle Infrastructure (NEVI) Formula Grant Program

Administered by Wyoming Department of Transportation

AI summary · 7/12/2026

Wyoming's NEVI program funds public DC fast-charging stations along alternative fuel corridors and routes to state and national parks, primarily designed for long-distance travelers rather than local use. If you plan cross-state EV trips, look for charging stations spaced roughly 50 miles apart near interstate exits and park access routes as the network expands.

Wyoming DOT solicits bids through RFPs to construct, maintain, and operate EV charging stations across 911 miles of designated corridors; the program requires private or local jurisdiction matching funds but no state match. Qualified contractors should monitor DOT RFP announcements and partner with local jurisdictions or businesses to secure sites along alternative fuel corridors or State/National park routes.

NEVI distributes Wyoming's federal allocation from the $5 billion national program to build charging networks along alternative fuel corridors (AFCs) and park routes. The state prioritizes deployment where local jurisdictions and private partners can demonstrate demand and co-fund projects, with stations operating at higher densities in fuel corridors than traditional interstate spacing, ensuring 911 miles of corridor coverage without requiring state matching funds or strict NEVI spacing criteria.

Program details

Program ID
22663
Effective
10/1/2022
Expires
9/30/2026Expired
Last updated
6/25/2024

Eligibility

Sectors
commercial
Technologies
direct current fast charging equipment

Incentive amount

$26,780,026

Program summary

Note: The Federal Infrastructure Investment and Jobs Act (IIJA) created the National Electric Vehicle Infrastructure (NEVI) Formula Grant Program with a total budget of $5 billion. Each state was allocated a share of that total to help build out a national network of electric vehicle charging stations along designated alternative fuel corridors (AFCs). With some limited exceptions, EV charging stations funded through the NEVI program should be spaced 50 miles apart and within one mile of the Interstate exit or highway.

The Wyoming Department of Transportation's (DOT) deployment plan stipulates that Wyomingites are currently not adopting the EV technology in enough numbers to require NEVI program station densities, with the greatest potential users being out-of-state travelers. The plan limits the number of additional NEVI-sized stations installed along interstates and recommends remaining funds be used for fuel corridor routes to State and National parks. The NEVI plan details several highlights including the use of matching funds from private or local jurisdictions, with no matching state funds to be used. The DOT will operate funds through a series of RFPs for biddings to construct, maintain, and operate stations along AFCs. The state deployment plan assumes that local jurisdictions and businesses are better suited to determine the size, frequency, location, and capacity of stations for their own needs and does not require that the stations must meet NEVI criteria. The plan will fund larger stations if local jurisdictions deem it appropriate. Deployment of the plan will result in the construction of 911 miles of EV charging corridors. The state's Final Year Two Plan was submitted in October 2023. In winter 2023/2024 WYDOT issued a RFI to gauge interest from private businesses or local governments who intend to apply for NEVI Funds.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in WY

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse WY programs