Program Summary

Tennessee does not have statewide interconnection standards. However, the Tennessee Valley Authority, which supplies electric utilities in Tennessee, does have interconnection procedures for small (20 MW or smaller) and large (larger than 20 MW) generating facilities. TVA interconnection procedures can also be found under the "Generator Interconnection" tab on the utility's OASIS homepage.