Interconnection Standards

AL Interconnection

Quick Summary

You can interconnect rooftop solar to Alabama Power's grid by submitting an application through PowerClerk and ensuring approval before installation; you'll need to comply with Southern Company's Interconnection Policy and Alabama Power's Technical Requirements Guidebook. You can apply a rate rider (RGB) to maintain grid backup power and may sell excess energy through Rate PAE (systems under 100kW) or Rate CPE (100kW and larger). Check local zoning rules and your homeowner's association before proceeding, and consider pairing solar with battery storage to address inconsistent sunlight.

AI-generated summary • Updated 7/12/2026

Program Details

Program ID
22626
Last Updated
1/2/2026

Eligibility

Eligible Technologies
solar photovoltaics wind (all) biomass fuel cells using non-renewable fuels wind (small) fuel cells using renewable fuels lithium-ion

Program Summary

Alabama does not have statewide interconnection standards. Southern Company, the parent company of Alabama Power Company, does have a policy on operation of distributed energy resources (DER) in parallel with the distribution system. The policy does not give explicit information on system size limits in relation to levels of review. The scope of any required system impact study is determined jointly by the DER owner and the utility. Following the system impact study, an interconnection equipment study may also be required. Incorporation of energy storage systems may require additional study.

Contact & Resources

Contact Email
[email protected]

Please verify current program details with the administering agency before making any financial decisions.

← Back to Search