CA Energy Storage Target

Energy Storage Procurement Target

Administered by California Public Utilities Commission

AI summary · 7/12/2026

This program does not provide direct incentives or rebates to homeowners; it is a utility-level procurement mandate requiring California's three major investor-owned utilities (SCE, PG&E, SDG&E) to procure energy storage systems to meet statewide targets. If you are interested in energy storage for your home, check with your utility for any behind-the-meter storage programs or incentives they may offer separately.

This program creates procurement opportunities for energy storage system vendors and installers, as the three IOUs must procure a combined 1,325 MW of storage capacity by 2020 through competitive solicitations across transmission-level, distribution-level, and customer-sited installations. Contractors should monitor CPUC decisions and utility RFPs for bid opportunities, and note that lithium-ion systems are the primary technology being procured under this mandate.

AB 2514 established a 1,325 MW statewide energy storage procurement target divided among SCE (580 MW), PG&E (580 MW), and SDG&E (165 MW), with annual milestones from 2014 to 2020 and final installations by end of 2024. The CPUC oversees procurement across three grid domains (transmission, distribution, customer-sited) and has approved over 1,533 MW of new capacity to date, with over 506 MW operational; the program aims to support grid optimization, renewable integration, and GHG reductions aligned with California's clean energy targets.

Program details

Program ID
22112
Last updated
11/24/2025

Eligibility

Sectors
investor-owned utility
Technologies
lithium-ion

Program summary

A.B. 2514 of 2010 required the California Public Utilities Commission (CPUC) to open a proceeding to determine appropriate targets, if any, for each load-serving entity to procure energy storage. After opening a proceeding in December 2010 to consider the matter, the CPUC adopted an energy storage procurement framework and established a statewide energy storage target of 1,325 MW by 2020, with Southern California Edison (SCE), Pacific Gas & Electric (PG&E), and San Diego Gas & Electric (SDG&E), each responsible for a portion of the total.


Storage Grid Domain2014201620182020Total
SCE90 MW120 MW160 MW210 MW580 MW
PG&E90 MW120 MW160 MW210 MW580 MW
SDG&E20 MW30 MW45 MW70 MW165 MW
Total200 MW270 MW365 MW490 MW1,325 MW

The total requirement for each utility is subdivided between systems installed at the transmission level, distribution level, and customer level.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.