Hillsborough County - Solar and Wind Standards
Hillsborough County's Land Development Code sets specific standards for residential solar and wind installations to ensure they fit safely in your neighborhood. Solar panels on your property in an agricultural zone must be on at least 5 acres, stay 50 feet from property lines, and be no taller than 15 feet; small wind turbines are limited to 45 feet in residential areas. To install either system, you'll need to obtain a building permit through the county's HillsGovHub online portal after your project passes zoning and site review requirements.
This ordinance establishes clear development standards that streamline permitting for solar and wind projects in Hillsborough County. Solar installations must meet setback, height, and fencing requirements, with underground electrical connections required; wind systems face height limits (45 feet residential, 120 feet elsewhere) and must comply with noise and wildlife protection rules. All projects proceed through the standard three-step county process—zoning review, site/subdivision engineering review, and building permitting via HillsGovHub—so familiarize clients with these timelines and documentation requirements upfront.
This Land Development Code provision establishes permitting standards rather than financial incentives, creating a regulatory framework that applies countywide to solar photovoltaic and wind energy systems across residential, commercial, and local government sectors. The code specifies technical standards (solar: minimum 5-acre lot, 50-foot setbacks, 15-foot max height, ground-mounted with fencing; wind: 45 feet in residential zones, 120 feet elsewhere, subject to noise and wildlife restrictions) and abandonment criteria (one year without production). Projects are processed through the standard development services workflow—zoning, site review, and building permitting—administered online via HillsGovHub, with inspections managed by county staff.
Program details
- Program ID
- 5926
- Last updated
- 8/17/2023
Eligibility
- Sectors
- commercial local government residential
- Technologies
- solar photovoltaics wind (all) wind (small)
Program summary
The Land Development Code for Hillsborough County outlines the appropriate uses and guidelines for the operation of a solar energy production facility and a wind energy conversion system (WECS).
For a solar facility in an agricultural zone, the proposed lot size shall be a minimum of five (5) acres. There should be a setback of 50 feet from all boundaries of the site. The solar panels should be ground mounted and have a maximum height of 15 feet.
Ground-mounted facilities must be enclosed with a fence. On-site power lines and interconnections shall be placed underground. Facilities will be considered abandoned after a one-year period without energy production.
For a WECS the maximum structure height is 45 feet in a residential area, measured from the ground to the top of the fixed portion of the tower (this excludes the wind turbine). The maximum height is 120 feet in all other zoning districts. There are protections for certain species and birds that may restrict construction of a WECS. Noise can affect the installation of a WECS, if the system is too loud.
For a full list of Permit and Inspection requirements see this form.
Contact & resources
- Additional resources
Please verify current program details with the administering agency before making any financial decisions.