Template Solar Energy Development Ordinance
This is a template ordinance published in December 2013 to guide North Carolina local governments in regulating solar energy systems—it has no legal authority itself. Check with your local city or county to see if they've adopted solar permitting rules based on this template. If they have, your roof-mounted or small ground-mounted solar photovoltaic or solar water heating system (under 1 acre) may qualify as a "Level 1" permitted use, requiring minimal approval, while larger systems require special permits and may need aviation notification if over half an acre near airports.
This is a non-binding template ordinance that local jurisdictions may adopt to regulate solar installations. Level 1 systems (roof-mounted or ground-mounted under 1 acre) are typically "permitted by right." Level 2 systems (larger ground-mounts in residential or commercial zones) require development standards compliance. Level 3 systems (solar farms and very large installations) need conditional use permits with public hearings. Systems over half an acre must provide aviation notification to the NC Commanders Council and submit glare analysis if airports are within 5 nautical miles; contact the relevant airport authority 30–45 days before construction.
This December 2013 template—developed by the NC Solar Center and NC Sustainable Energy Association with 40+ stakeholders—classifies projects into three levels based on size and location to streamline permitting. Level 1 systems are ministerial approvals; Level 2 systems need compliance review; Level 3 systems require special permits with public process. All systems over half an acre must verify aviation safety via Sandia's Solar Glare Hazard Analysis Tool and notify airports within 5 nautical miles. Level 2 and 3 systems require decommissioning plans (removal, restoration within one year, and updated schedules). The ordinance applies statewide if localities adopt it but carries no statewide mandate.
Program details
- Program ID
- 5445
- Last updated
- 8/11/2023
Eligibility
- Sectors
- commercial industrial local government nonprofit residential schools state government federal government
- Technologies
- solar water heat solar photovoltaics
Program summary
- Roof-mounted, building integrated, mounted over a parking lot, or ground-mounted and no more than half the footprint of the primary structure on the lot or 1 acre
- Ground-mounted system with a footprint of no more than ½ an acre in residential districts, no more than 10 acres in commercial/business districts, and of any size in industrial districts
- Systems that do not meet the requirements of Level 1 or 2 systems. Most solar farms are Level 3 systems.
Contact & resources
- Additional resources
Please verify current program details with the administering agency before making any financial decisions.