Denver offers same-day permit review for most residential rooftop solar projects through its streamlined process and SolarAPP+ software, making it one of the nation's first "Solar Friendly Communities." For single-family or duplex homes with systems up to 10 kW-DC and 200-amp service, you can submit applications through SolarAPP+ with a licensed electrician, with solar permit fees capped at $50; zoning permits are required only if panels are angled or you're adding energy storage, and plumbing permits apply to solar hot water systems.

Denver requires electrical, plumbing, and zoning permits for solar projects, with residential rooftop systems eligible for same-day approval via SolarAPP+ if they meet specifications (≤10 kW-DC, ≤200 amps, on single-family/duplex homes); you must be a licensed electrician to submit SolarAPP+ applications, and total fees depend on project valuation with a capped $50 solar permit fee plus potential 20% same-day review fees ($100 minimum) for larger projects. More complex projects involving energy storage, panel upgrades, or landmark districts may require plan review with longer timelines.

Denver's SolarAPP+ system, launched April 2023, automates compliance checks and building permit issuance for eligible residential rooftop solar (≤10 kW-DC, ≤200 amps, single-family/duplex only), while zoning and plumbing permits remain required based on installation type; fees are capped at $50 for solar permits with additional same-day review fees (20% of permit fee, minimum $100) applied case-by-case; non-residential projects and those in landmark districts proceed through standard plan review (1–3 weeks or longer).

Program details

Program ID
5348
Last updated
5/29/2024

Eligibility

Sectors
commercial construction industrial residential installers/contractors multifamily residential institutional
Technologies
solar water heat solar photovoltaics lithium-ion

Program summary

The City and County of Denver was designated the first "Solar Friendly Community" in the nation based upon its streamlined permitting process.

Denver provides same-day permit review for most solar panel projects. Electrical, Plumbing, and Zoning Permits* are required for photovoltaic (PV) systems installed in the city of Denver, although more complex engineering projects may still be required to go through the Plan Review process.

Permitting Process

Zoning Permits are required if the panels will be installed at an angle to the slope of the roof and are not "flush mounted," or if a generator or energy storage system is a part of the project. Plumbing Permits are required for solar hot water systems. Technical requirements and necessary documents can be found on the city website.

SolarAPP+ (residential only)

In April 2023, Denver began using SolarAPP+, a plan review software program developed by the National Renewable Energy Laboratory, for residential rooftop solar systems. SolarAPP+ uses the city's online e-permits system to provide "quick permits" to eligible systems, running compliance checks and processing building permit approvals. Along with rooftop solar, SolarAPP+ can also process permits for projects with energy storage systems, main electrical panel upgrades, and main electrical panel deratings related to solar installation. Solar systems must be rooftop systems on single-family or duplex homes, with a utility service of 200 amps or less, and a nameplate rating of 10 kW-DC or less. Applications through SolarAPP+ must be submitted by a licensed electrician.

Fees

Zoning and Building Permit fees are based on valuation of the work to be completed, including the labor and materials. Although fees for solar panels are capped at $50 for all permits, total construction fee schedules should be verified with the city of Denver on a case-by-case basis. When Same Day Review is required for the #1R permit, a "walk through" fee may be charged in addition to the building permit fees, depending on the valuation of the project; the fee is 20% of the Permit fee, with a minumum charge of $100 for all projects valued over $2,000.

*A Landmark Certificate of Appropriateness is also required if the PV system is being installed in a Landmark District or on a designated landmark structure. The approval typically takes one to three weeks. More complex projects or projects requiring Landmark Preservation Commission or Lower Downtown Design Review Board approval will take longer.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in CO

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse CO programs