If you want a small wind turbine (10 kW or less) at your home in Madison County, it is generally allowed in residential zones as a conditional use, meaning the Board of Adjustment must find that all requirements are met. Your turbine must be set back twice its tower height from property lines, public roads and occupied buildings on your own property, and 2.5 times the tower height from occupied buildings on neighboring parcels. Check the county land use ordinance for your zoning district's specific rules and installation, design and decommissioning requirements.

Madison County's May 2010 land use ordinance sorts wind projects into small (10 kW or less), medium (over 10 kW up to 50 kW) and large (over 50 kW), and permitting depends on size and zoning district. Small systems are a conditional use in residential zones needing Board of Adjustment approval and are a permitted use in most other districts, while medium systems are not allowed in most residential districts but are conditional in most others. All systems must meet setbacks of 2 times tower height from property lines, public roads and on-site occupied buildings and 2.5 times tower height from occupied buildings on adjacent parcels, plus the ordinance's installation, design and decommissioning requirements.

This is a local land use ordinance adopted in May 2010, not a funded incentive, and it sets permitting standards for wind energy systems across commercial, industrial, residential and agricultural sectors. It classifies systems by rated capacity as small, medium or large, and assigns permitted or conditional use status by zoning district, with the Board of Adjustment reviewing conditional uses such as small systems in residential zones and large systems in commercial and residential-agricultural districts. Uniform setbacks of 2 and 2.5 times tower height apply, noise and shadow flicker limits apply only to large systems, and the ordinance also covers installation, design and decommissioning.

Program details

Program ID
4332
Last updated
6/27/2024

Eligibility

Sectors
commercial industrial residential agricultural
Technologies
wind (all) wind (small)

Program summary

Madison County adopted a new land use ordinance in May 2010, which includes provisions for permitting wind turbines within the county.

For the purposes of this ordinance, wind-energy facilities are classified as "small" if they consist of one or more turbines with a rated generating capacity of 10 kilowatts (kW) or less, “medium” if a project has a rated capacity between 10 kW and 50 kW, and large if a project has a rated capacity of more than 50 kW. In general small wind energy facilities are treated as a conditional use in residential zones. As a conditional use, a small wind energy facility may be installed in the approved residential zoning districts if the Board of Adjustment finds that all requirements have been met. Small wind energy facilities are treated as a permitted use in most other zoning districts. Medium wind energy facilities are not permitted in most residential zoning districts, but are treated as a conditional use in most others. Large wind energy facilities are treated as a conditional use in the commercial and residential-agricultural zoning districts. A full break down of the permitting requirements for wind facilities in each zoning district can be found in the land use ordinance above.

The ordinance requires all wind energy facilities to be setback from property lines, public roads and occupied buildings on the wind turbine owner's property a distance equal to twice the height of the tower. They must also be setback a distance of 2.5 times the tower height from any occupied buildings on an adjacent parcel of land not owned by the wind turbine owner.

The ordinance also establishes restrictions to reduce noise and shadow flicker produced by large wind energy facilities. The ordinance does not establish similar restrictions for small and medium systems as these issues should be indirectly addressed by the setback requirements and existing noise ordinances. Requirements for the installation, design and decommissioning of systems are also addressed in the ordinance.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in NC

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse NC programs