MA Grant Program

Commonwealth Hydropower Program

Administered by Massachusetts Clean Energy Center (MassCEC)

AI summary · 7/12/2026

Commonwealth Hydropower provides grants up to $300,000 (or 50% of project costs, whichever is lower) to upgrade existing hydroelectric facilities or build new conduit-based hydropower systems in Massachusetts. You must demonstrate control of your project site, ensure the facility qualifies for Massachusetts' Renewable Portfolio Standard, and contribute 10-50% in matching funds depending on project type. Applications are due once yearly—the 2026 Round 15 window closed April 7, 2026, but you can prepare for future solicitations through MassCEC's website.

You can help clients modernize small hydropower installations or develop conduit projects (water/wastewater infrastructure-based generation) to increase energy output and efficiency while qualifying for state incentive funding. Projects must hold or be eligible for FERC licensing/exemptions, exclude new-dam construction, demonstrate 20+ years of useful life, and show incremental energy production modeled per MassCEC methodology. Clients must be commercial, industrial, nonprofit, institutional, or public entities served by Massachusetts investor-owned utilities (National Grid, Eversource, Unitil) or Municipal Light Plants contributing to the Renewable Energy Trust Fund.

Commonwealth Hydropower, administered by MassCEC using the Massachusetts Renewable Energy Trust Fund, awards grants annually (max $300,000 per project or 50% of costs) for feasibility studies and design/construction of hydroelectric upgrades and conduit facilities. Applicants must demonstrate site control, RPS qualification, cost-share ranging from 10% (conduit feasibility) to 50% (design/construction), and projects are scored on energy production gains, regulatory compliance, financial feasibility, and ecological impacts. Round 15 (2026) closed April 7; selection is announced in June, and awarded projects must meet specified milestones and reporting requirements.

Program details

Program ID
3677
Last updated
1/6/2026

Eligibility

Sectors
commercial industrial local government nonprofit tribal government institutional
Technologies
hydroelectric hydroelectric (small)

Incentive amount

$300,000 (Round 14)

Program summary

Note: The Commonwealth Hydropower Round 14 Solicitation closed May 16, 2025.

Through the Commonwealth Hydropower Initiative, the Massachusetts Clean Energy Center (MassCEC) offers grants for both feasibility studies and construction of hydroelectric facilities. The max possible grant amount is capped at $300,000 or 50% of actual costs. Hydropower facilities must have qualified (or be expected to qualify) for Massachusetts' Renewable Portfolio Standard. MassCEC is the administrator of the Massachusetts Renewable Energy Trust Fund, the state's clean energy fund.

Eligibility

Applicants must have and demonstrate site control (meaning that they have legal control of the project site, through executed agreement or selection to enter into an agreement.) In addition, the project must have at least 20 years of useful life. Projects must have a Federal Energy Regulatory Commission (FERC) license or exemption, or a FERC order stating that the facility does not fall under FERC jurisdiction (not common), or the projects must be eligible for a conduit exemption. Projects that require new dams are not eligible.

Projects must be owned by commercial, industrial, institutional (including not-for-profit), or public entities served by one of the investor-owned electric distribution utilities in Massachusetts -- Fitchburg Gas and Electric Light (Unitil), Massachusetts Electric (National Grid), Nantucket Electric (National Grid), or Eversource -- that contribute to the Renewable Energy Trust Fund. In addition, customers of any Municipal Light Plant (MLP) Department that pays into the Renewable Energy Trust are also eligible (see MassCEC's website for additional information on which MLPs have joined the Renewable Energy Trust Fund.)

Cost-Share

Projects applying for conduit facility feasibility funding must provide a 10% cost-share, while other feasibility study applicants must provide at least 20% cost-share. Design and construction project applicants are responsible for at least 50% cost-share. It should be noted that applicants are encouraged to request less than the maximum allowed funding.

Evaluation Criteria

This is a competitive grant. All applications must meet minimum eligibility criteria and will be evaluated on the clarity of facility and project descriptions, compliance with dam safety regulations, satisfactory explanation of regulatory/licensing status, status of state renewable portfolio standard qualification, and incremental energy production. Projects applying for Design and Construction grants will also be evaluated on thoroughness of feasibility analysis, technical considerations, an estimate of increased generation, ecological impacts, regulatory and permitting issues, project financing and financial feasibility, and risks identification and strategy for overcoming those risks. Awarded projects are required to meet project milestones, deliverables, and reporting deadlines.

Applications must be submitted according to MassCEC format guidelines; both hard copies and electronic copies are required. See the program website for details and for a complete application package. View the Round 12 Background and Instructions document here.

Contact & resources

Contact email
hydro@masscec.com

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in MA

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse MA programs