AZ Solar/Wind Permitting Standards

Solar Construction Permitting Standards

AI summary · 11/22/2026

In Arizona you need a building permit from your city or county before installing solar PV or a solar water heater. State law says permit fees can only cover what it actually costs the local government to provide the service, and you generally can't be required to submit a professional engineer's stamp unless it's deemed necessary. If an engineering stamp is required, the city or county must give you a written explanation of why.

Solar PV and solar water heating installations in Arizona require a building permit from the local county or municipality, so you should check with the local permitting office for its process. Customers benefit because fees must be directly tied to the cost of the service, and professional engineer stamps cannot be demanded unless deemed necessary, in which case the jurisdiction must explain why in writing. This can lower permitting costs and reduce delays for your projects.

Established by H.B. 2615 (signed May 2008), this statewide standard governs how Arizona counties and municipalities permit solar PV and solar water heating systems, while permits remain issued locally. Fees must be directly attributable to and defray the expense of the service, so permits cannot be used to raise revenue, and a jurisdiction must hold a public hearing with at least fifteen days of public notice before adopting a standard permit fee. The rules apply to residential, commercial, industrial, agricultural, nonprofit, and local government sectors and are funded through locally collected cost-based permit fees rather than a state incentive.

Program details

Program ID
2950
Last updated
8/16/2023

Eligibility

Sectors
commercial industrial local government nonprofit residential agricultural
Technologies
solar water heat solar photovoltaics

Program summary

Owners of solar photovoltaic (PV) systems and solar water heating systems in Arizona are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities in Arizona have been free to adopt their own requirements and assign their own fees for a permit. With exceptions, these fees are generally derived from a formula that takes into account the cost and size of the project along with the cost of conducting inspections. H.B. 2615, signed in May 2008, established specific standards for the way permits are awarded for PV and solar water heating installations throughout Arizona and applied rules to govern the fees municipalities and counties can charge for a permit.

Municipalities and counties in Arizona may no longer require a stamp from a professional engineer to approve a solar system installation, which can raise the cost of a permit, unless such a certification is deemed necessary. In cases where an engineering stamp is deemed necessary, the city or county must provide the permittee with a written explanation of why the stamp is necessary.

Any building or permit fee assessed by a county or municipality for solar construction must be directly attributable to and defray the expense of the service for which the fee is charged. Rather than using the permit fee as a vehicle to increase revenue, the city or municipality may only charge the permittee exactly what it costs them to issue a permit. Further, before adopting a standard permit fee, the county or municipality must hold a public hearing with at least fifteen days of public notice.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in AZ

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse AZ programs