If you have solar or another renewable system up to 2 MW and are served by a Florida investor-owned utility, state rules give you a standard, expedited path to connect to the grid; systems of 10 kW or less (Tier 1) pay no application fee and need no interconnection study or liability insurance. Your system must meet NEC, IEEE 1547 and UL 1741 standards, be approved by local code officials, and not exceed 90% of your utility distribution service rating. Get the application forms from your utility's website, and note that co-op and municipal utility customers should check with their own utility since the PSC rules do not apply to them.

Customers of investor-owned utilities can use a standard interconnection agreement and expedited process for renewable systems up to 2 MW, with Tier 1 (10 kW or less) free of application fees, studies and insurance requirements. Tier 2 (over 10 kW to 100 kW) and Tier 3 (over 100 kW to 2 MW) systems may need $1 million and $2 million of general liability insurance respectively, and the utility may require a customer-paid external disconnect switch. Equipment must meet NEC, IEEE 1547, IEEE 1547.1 and UL 1741, pass local code inspection before interconnection, and be sized at no more than 90% of the customer's distribution service rating, and each utility has its own application forms.

The Florida PSC adopted these rules in March 2008 for investor-owned utilities only, with three tiers (up to 10 kW, over 10 to 100 kW, and over 100 kW to 2 MW) and mutual indemnification, and H.B. 7135 (June 2008) confirmed the PSC's authority to do so. Utilities must offer a standard interconnection agreement, and the rules cover many technologies and sectors including residential, commercial, industrial, government, nonprofit and agricultural customers. Municipal utilities and electric cooperatives were required to develop their own standardized interconnection agreement and net metering program by July 1, 2009 and to file annual participation reports with the PSC, though the PSC lacks direct authority over them.

Program details

Program ID
2882
Last updated
1/2/2026

Eligibility

Sectors
commercial industrial local government nonprofit residential schools state government federal government tribal government agricultural institutional
Technologies
geothermal electric solar thermal electric solar photovoltaics wind (all) biomass hydroelectric hydrogen combined heat & power landfill gas tidal wave ocean thermal wind (small) hydroelectric (small) anaerobic digestion

Program summary

In March 2008, the Florida Public Service Commission (PSC) adopted interconnection rules for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply only to the state's investor-owned utilities; the rules do not apply to electric cooperatives or municipal utilities.

Florida's interconnection rules include provisions for three tiers of renewable-energy systems:

  • Tier 1: 10 kilowatts (kW) or less
  • Tier 2: Larger than 10 kW, but not larger than 100 kW
  • Tier 3: Larger than 100 kW, but not larger than 2 MW

To qualify for expedited interconnection under the PSC rules, the customer-owned renewable generation must have a gross power rating that does not exceed 90% of the customer’s utility distribution service rating. Tier 1 applicants are not subject to application fees, interconnection studies or liability insurance. Utilities may require that applicants have proof of general liability insurance of $1 million for Tier 2 and $2 million for Tier 3 customers.

An external disconnect switch is not required for inverter-based Tier 1 systems, but a utility may choose to install a disconnect switch for a Tier 1 system at the utility's expense. Utilities are authorized to require customers with Tier 2 and Tier 3 systems to install a disconnect switch at the customer's expense. The PSC rules also require mutual indemnification.

Utilities must offer customers a standard interconnection agreement for the expedited interconnection of renewable generation systems. All systems must meet all applicable safety and performance standards established by the National Electric Code (NEC), the Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL), including the IEEE 1547, IEEE 1547.1 and UL 1741 standards. In addition, systems must be inspected and approved by local code officials prior to interconnection to ensure compliance with applicable local codes.

In June 2008, Florida enacted legislation (H.B. 7135) confirming that the PSC had the authority to adopt the March 2008 rules related to interconnection and net metering for investor-owned utilities.* In addition, H.B. 7135 required municipal utilities and electric cooperatives to "develop a standardized interconnection agreement and net metering program for customer-owned renewable generation" by July 1, 2009. However, the law does not provide specific guidance for municipal utilities and electric cooperatives. Municipal utilities and electric cooperatives are required to file an annual report with the PSC detailing customer participation, although the PSC does not have direct authority over these utilities.

*While the PSC regulates investor-owned utilities, individual utilities have different forms for net metering and interconnection applications. Customers should visit their utility web site for more information and for appropriate net metering and interconnection application forms.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in FL

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse FL programs