UT Building Energy Code
AI summary · 7/12/2026

Utah residential buildings constructed after July 1, 2024 must meet the 2021 International Energy Conservation Code (IECC), ensuring better insulation, efficient HVAC systems, and reduced energy costs over the building's lifetime. You'll work with your builder to ensure the home passes energy code compliance inspections before occupancy, which is a standard part of the permitting process.

Utah residential projects must comply with the 2021 IECC (effective July 1, 2024); commercial projects must meet the 2021 IECC and ASHRAE 90.1-2019. You must submit plans and specifications as required by your local jurisdiction and pass field inspections before a certificate of occupancy is issued; compliance pathways and plan review procedures are specified within the code itself. If a local agency's interpretation is disputed, there is a formal appeal process through the Building Code Commission.

Utah adopted the 2021 IECC for residential buildings (effective July 1, 2024) and the 2021 IECC plus ASHRAE 90.1-2019 for commercial buildings (also effective July 1, 2024), replacing the previous 2015/2018 versions. The state delegates enforcement to local jurisdictions, which review plans, conduct inspections, and issue certificates of occupancy; Emy Lesofski (Utah Office of Energy Development) oversees state energy code methodology. The state permits use of COMcheck and REScheck compliance tools for both sectors.

Program details

Program ID
1878
Last updated
6/18/2023

Eligibility

Sectors
commercial residential
Technologies
comprehensive measures/whole building

Program summary

Much of the information presented in this summary is drawn from the U.S. Department of Energy’s (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed information about building energy codes, visit the DOE and BCAP websites.

Changes to the energy code are submitted to the Uniform Building Code Commission. The proposed change is reviewed by the Commission at a monthly meeting to decide if it warrants further consideration. If accepted, the Commission determines if enforcement will be enacted as a statewide amendment or restricted to a specific locality.

Effective July 1, 2019 , all residential buildings must comply with the 2015 International Energy Conservation Code (IECC) using the compliance pathways, plan submittal, and plan review as specified within that code. All commercial buildings must comply with the 2018 IECC and ASHRAE 90.1-2016. Plans and specifications must be submitted when required by the local jurisdiction. Field inspections, as part of the normal building inspection process, are required prior to the issuance of a certificate of occupancy.

If the local compliance agency refuses to establish a method of appeal to their interpretation and application of the State Uniform Building Standards, the appealing party may petition the Building Code Commission for agency action on the issue.

Contact & resources

Contact email
scuan@utah.gov

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in UT

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse UT programs