If you install a renewable energy system like solar, wind, or geothermal in Louisiana, your utility must allow you to interconnect and net meter, with residential systems eligible up to 25 kW. To get started, submit an interconnection agreement to your utility at least 45 days before connecting; you'll pay a one-time meter installation charge and other interconnection costs. Note that for systems installed after December 31, 2019, you pay the full retail rate for energy purchased and receive Avoided Cost credit for excess energy sold back to the utility.

You can offer customers grid-tied renewable systems (solar, wind, hydro, geothermal, biomass, plus qualifying fuel cells and microturbines) with residential capacity up to 25 kW and commercial up to 300 kW. Systems must meet NEC, IEEE, NESC, and UL safety standards and include a manual external disconnect switch, though this can be waived if the inverter meets specific automatic shutdown, warranty, and utility inspection conditions. Help customers file the PSC-approved standard interconnection agreement 45 days in advance and be aware that post-2019 installations are compensated at Avoided Cost for exported energy.

The Louisiana PSC adopted net metering and interconnection rules in November 2005 (based on Arkansas's rules), applying to investor-owned utilities and rural electric cooperatives but not municipal utilities, and covering residential (up to 25 kW) and commercial (up to 300 kW) systems across residential, commercial, industrial, and agricultural sectors. Utilities cover the meter cost while customers pay installation and defined interconnection costs, and the PSC may authorize higher charges after public comment if utility costs outweigh system and public-policy benefits. Under the 2019 General Order (Distributed Generation Rules), customers installing after December 31, 2019 pay full retail rate for purchased energy and are credited at annually updated Avoided Cost rates for energy sold back.

Program details

Program ID
1083
Last updated
1/14/2024

Eligibility

Sectors
commercial industrial residential agricultural
Technologies
geothermal electric solar photovoltaics wind (all) biomass hydroelectric wind (small) fuel cells using renewable fuels microturbines

Program summary

The Louisiana Public Service Commission (PSC) adopted rules for net metering and interconnection in November 2005. Louisiana's rules, based on those in place in Arkansas, require publicly-owned utilities and rural electric cooperatives to offer net metering to customers with systems that generate electricity using solar, wind, hydropower, geothermal or biomass resources.* Fuel cells and microturbines that generate electricity entirely derived from renewable resources are also eligible. The rules apply to residential facilities with a maximum capacity of 25 kilowatts (kW) and commercial systems with a maximum capacity of 300 kW.

Utilities must provide customers with a meter capable of measuring the flow of electricity in both directions. Although utilities must pay for the cost of the meter itself, customer-generators must pay a one-time charge to cover the installation cost of the meter. Interconnected systems must meet all safety and performance standards established by local and national electric codes, including the National Electric Code (NEC), the Institute of Electrical and Electronics Engineers (IEEE), the National Electrical Safety Code (NESC), and Underwriters Laboratories (UL). A manual external disconnect switch is required for all interconnected systems. The manual external disconnect switch requirement is waived if the inverter is designed to shut down if utility service is lost, the inverter is warranted by the manufacturer to shut down in this situation, and the inverter has been inspected and tested by utility personnel.

Customers seeking to interconnect and net meter must submit an interconnection agreement to a utility 45 days before interconnection. Utilities must use a PSC-approved standard interconnection agreement for interconnected facilities.

Customers must pay for "interconnection costs," defined as "the reasonable costs of connection, switching, metering, transmission, distribution, safety provisions and administrative costs incurred by the electric utility directly related to the installation and maintenance of the physical facilities necessary to permit interconnected operations with a net-metering facility, to the extent the costs are in excess of the corresponding costs which the electric utility would have incurred if it had not engaged in interconnected operations, but instead generated an equivalent amount of electric energy itself or purchased an equivalent amount of electric energy or capacity from other sources." Furthermore, following notice and opportunity for public comment, the PSC may authorize a utility to assess customer-generators "a greater fee or customer charge, of any type, if the electric utility's direct costs of interconnection and administration of net metering outweigh the distribution system, environmental and public-policy benefits of allocating the costs among the electric utility's entire customer base."

*The PSC regulates investor-owned utilities and electric cooperatives in Louisiana; it does not regulate municipal-owned utilities, and its rules do not apply to municipal utilities. Municipal utilities must develop their programs based on the statute.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in LA

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse LA programs