Missouri's net metering law lets you generate electricity from wind, solar, hydroelectric, fuel cells, or other DNR-certified renewable sources and export excess power to offset future utility bills at the same rates you pay for grid electricity. To connect a system up to 100 kW, submit an application with wiring diagrams and electrician certification; the utility must respond within 30 days for systems 10 kW or smaller, 90 days for larger systems. You pay only standard utility rates with no extra interconnection, standby, or capacity fees, though you reimburse the utility for any meter equipment upgrades needed to measure net generation.

You can install qualifying renewable systems (wind, solar, hydroelectric, fuel cells using renewable hydrogen) for residential and commercial customers across Missouri's regulated utilities, municipal systems, and rural cooperatives. Customers need electrician or engineer certification that installations meet applicable codes (NEC, NESC, IEEE, UL); systems must be sized to primarily offset the customer's own electricity use and not exceed 100 kW. For systems over 10 kW, minimum liability insurance is $100,000; smaller systems require no insurance, and all receive simplified interconnection approval within 30 or 90 days.

Missouri's net metering framework, enacted in 2007 and administered by the PSC for investor-owned utilities and by individual municipal utilities and rural cooperatives, provides net metering credits at avoided fuel cost rates to customer-generators using qualifying renewables. The program covers systems up to 100 kW on customer-controlled property across residential, commercial, industrial, government, nonprofit, and institutional sectors; utilities review applications in 30 days (≤10 kW) or 90 days (>10 kW) and must use identical rate structures and tariffs as non-generators. Funding flows through standard utility revenue; the PSC set minimum liability insurance at $100,000 for systems over 10 kW and zero for systems 10 kW or under.

Program details

Program ID
784
Last updated
5/31/2024

Eligibility

Sectors
commercial industrial local government nonprofit residential schools state government federal government institutional
Technologies
solar thermal electric solar photovoltaics wind (all) hydroelectric wind (small) fuel cells using renewable fuels

Program summary

Missouri enacted legislation in June 2007 requiring all electric utilities—investor-owned utilities, municipal utilities, and electric cooperatives—to offer net metering to customers that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells using hydrogen produced by one of the aforementioned resources, and other sources of energy certified as renewable by the Missouri Department of Natural Resources.

The Missouri Public Service Commission (PSC) adopted administrative rules for investor-owned utilities that included simplified interconnection standards, and electric cooperatives and municipal utilities adopted their own rules, including an all-in-one document that includes a simple interconnection request, simple procedures, and a brief set of terms and conditions.

Systems must meet all applicable safety, performance, interconnection and reliability standards established by any local code authorities, the National Electrical Code (NEC), the National Electrical Safety Code (NESC), the Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL) for distributed generation. Utilities may require customers to provide a switch, circuit breaker, fuse or other easily accessible device or feature that allows the utility to manually disconnect the system.

System Capacity Requirements

Systems must be intended primarily to offset part or all of a customer's own electrical energy requirements, have a capacity up to 100 kilowatts (kW), and be located on a facility owned, operated, leased or otherwise controlled by the customer.

Process

Utilities must offer a net-metering tariff or contract that is identical in electrical energy rates, rate structure, and monthly charges to the contract or tariff that the customer would be assigned if the customer were not an eligible customer-generator. Utilities may not charge the customer any additional standby, capacity, interconnection, or other fee or charge that would not otherwise be charged if the customer were not an eligible customer-generator.

Applications for interconnection must be accompanied by a plan for the customer's system, including a wiring diagram and specifications for the generating unit. Utilities must review and respond to the customer within 30 days for systems up to 10 kW, and within 90 days for systems greater than 10 kW. Prior to interconnection, a customer must furnish the utility with certification from a qualified professional electrician or engineer that the installation complies with the established safety and operating requirements.

In June 2009 the PSC reduced the minimum liability insurance requirement for systems larger than 10 kW to $100,000 and eliminated the insurance requirement for systems of 10 kW and smaller. Insurance requirements may be met with an additional insurance policy or an endorsement on an existing policy.

Contact & resources

Contact email
energy@dnr.mo.gov

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in MO

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse MO programs