GA Interconnection
AI summary · 11/1/2026

Georgia law lets you connect a rooftop solar, small wind, or fuel cell system to the grid so you can generate your own power. Your system must meet national standards from IEEE, UL, and the NEC, and your utility cannot require extra tests or additional liability insurance. Contact your electric utility to start the interconnection process, since total distributed generation is capped at 0.2% of the utility's prior-year peak demand.

Customers in residential, commercial, industrial, government, school, and nonprofit sectors can interconnect PV, wind, or fuel cell systems under the Georgia Cogeneration and Distributed Generation Act of 2001. Installations must comply with IEEE, UL, and NEC standards, and the Georgia PSC may add safety, power-quality, or interconnection requirements. Utilities cannot demand additional tests or liability insurance, and the state standards do not require a manual external disconnect device.

The Georgia Cogeneration and Distributed Generation Act of 2001 sets interconnection rules for PV, wind, and fuel cell systems across residential, commercial, industrial, institutional, and government customers. Aggregate distributed generation capacity is limited to 0.2% of a utility's prior-year system peak demand, and systems must meet IEEE, UL, and NEC standards, with the Georgia PSC able to adopt further safety, power-quality, and interconnection requirements. The rules bar utilities from requiring additional tests or liability insurance and contain no manual external disconnect requirement; this is a regulatory standard with no dedicated funding.

Program details

Program ID
782
Last updated
1/3/2026

Eligibility

Sectors
commercial industrial local government nonprofit residential schools state government federal government institutional
Technologies
solar photovoltaics wind (all) fuel cells using non-renewable fuels wind (small) fuel cells using renewable fuels

Program summary

The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential and commercial electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year.

Interconnected customers must comply with all relevant national standards, including those established by the Institute of Electrical and Electronic Engineers (IEEE), Underwriters Laboratories (UL), and the National Electrical Safety Code (NEC). Furthermore, the Georgia Public Service Commission (PSC) may adopt additional safety, power-quality and interconnection requirements. There is no provision in Georgia's interconnection standards requiring customers to install a manual external disconnect device. Utilities may not require additional tests or additional liability insurance.

Contact & resources

Please verify current program details with the administering agency before making any financial decisions.