Boulder's Solar Access Ordinance protects your right to sunlight by limiting how much shade new neighboring construction can cast on your property, with protection defined by a 12-foot or 25-foot "solar fence" depending on your zoning district—the goal is to preserve 4 hours of unobstructed sunlight on December 21st. If you install a solar energy system, you can apply for a solar access permit that locks in additional protection for the life of your system. You can challenge violations through a Solar Exception process or document insubstantial breaches (narrow shadows reducing solar access by 10% or less).
When designing new construction or additions in Boulder, you must prepare and submit a solar analysis demonstrating compliance with solar access regulations before your building permit is approved; the city provides a Solar Access Guide with step-by-step instructions. Your design cannot shade adjacent protected areas beyond the applicable solar fence limit, though shadows on streets, alleys, and front yard setbacks may be permissible. If your proposal cannot comply, you can request a Solar Exception (with affected property owner permission) or incorporate alternative energy conservation measures that exceed the Green Points Building Program to potentially waive solar siting requirements.
The ordinance (Boulder Revised Code section 9-9-17) is a regulatory framework with no grant funding; it operates through building permit review and enforcement requiring solar analysis submissions. Three Solar Access Areas with different protection levels (12-foot fence, 25-foot fence, or permit-based) apply based on zoning. Solar access permits remain valid for the reasonable life of the system, expiring if not installed within 1 year or inactive for 2+ years. New residential units must support 75 square feet of unshaded solar collectors per dwelling; non-residential buildings with 1,000+ gallons/day hot water demand must have roofs capable of supplying 50% of needs. Variances (Solar Exceptions) and insubstantial breach determinations are processed administratively with property owner consent.
Program details
- Program ID
- 438
- Last updated
- 12/22/2025
Eligibility
- Sectors
- commercial construction local government residential multifamily residential
- Technologies
- solar - passive solar water heat solar space heat solar thermal electric solar photovoltaics
Program summary
The City of Boulder enacted an ordinance in 1982 to guarantee access to sunlight for homeowners and renters.
Solar Access
Solar access is guaranteed setting limits on the amount of permitted shading by new construction. The degree of solar access protection is defined by either a 12 foot or 25 foot hypothetical "solar fence" on the property lines of the protected buildings. The ordinance is designed to protect access for a 4-hour period on December 21st. Under most circumstances, new structures will not be allowed to shade adjacent lots to a greater extent than the applicable solar fence.
There are three Solar Access Areas in Boulder based on a property’s zoning district. Depending on the applicable Solar Access Area, a lot is protected by a 12 foot solar fence, a 25 foot solar fence, or only through the solar permit process. For adjoined duplexes and townhouses, the solar fence line is along the exterior lot line, not along the interior lot line of the adjoined units.
Solar Access Permitting
A solar access permit is also available to those who have installed or who plan to install a solar energy system and need more protection than is provided automatically by the applicable solar fence. Once granted, a solar access permit is valid for the reasonable life expectancy of the particular solar energy system; a permit also expires if the solar energy system is not installed within 1 year after issuance of the permit or “has not functioned to fulfill its intended purpose for a continuous period of 2 or more years.” Permits may be renewed after expiration.
Solar Siting Requirements
All planned unit developments and subdivisions must be designed and constructed to provide good access to solar. Specifically, all residential units are required to have the following:
- oriented within 30 degrees of a true east-west direction;
- is flat or not sloped towards true north;
- is physically and structurally capable of supporting at least 75 square feet of un-shaded solar collectors for each individual dwelling unit in the building; and
- has unimpeded solar access through the ordinance or easements, covenants, or other private agreements among affected landowners.
Each nonresidential building with an anticipated hot water demand of 1,000 gallons a day or more must have a roof surface meeting the following criteria:
- is flat or oriented within 30 degrees of a true east-west direction,
- is physically and structurally capable of supporting a solar collector or collectors capable of providing at least 50% of the anticipated hot water needs of the building, and
- has unimpeded solar access through the solar access ordinance or other private agreements that protect solar access for the roof surface.
Waivers of solar siting requirements are available to developers for a variety of reasons, such as if the proposed development incorporates additional energy resource and conservation options that exceed the requirements of the Green Points Building Program.
Contact & resources