VA Solar/Wind Permitting Standards

Rockingham County - Small Wind Ordinance

AI summary · 11/22/2026

Rockingham County, VA allows small wind turbines on your property if the main purpose is to reduce your own electricity use and your parcel is at least 1 acre. Towers can be up to 65 feet on 1 to 5 acre parcels and 80 feet on parcels over 5 acres, and must sit back 110% of tower height from property lines and 150% from neighbors' homes, though neighbors can consent to reduce these limits. Noise must stay at or below 60 decibels at the nearest property line, and you'll need proof of liability insurance; check with the county for how to apply.

This ordinance gives customers in Rockingham County a clear zoning path to install small wind systems that offset on-site electricity use, and it complements Virginia's net metering rules even though net metering is not required. Installations must comply with the Uniform Statewide Building Code, FAA regulations, the National Electrical Code, and Virginia net metering regulations. Design around the 1-acre minimum parcel, 65 or 80 foot height caps, 110% and 150% setbacks (reducible with adjacent owner consent), the 60 decibel limit, and the liability insurance proof requirement.

Approved by the Rockingham County Board of Supervisors in October 2004, this zoning ordinance was the first small wind ordinance in Virginia, drafted by James Madison University students with guidance from the Virginia Wind Energy Collaborative and the county planning board. It sets standards rather than offering funding: primary use for on-site consumption, 1-acre minimum parcel, height caps by parcel size, setbacks from property lines and neighboring dwellings, a 60 decibel noise limit, and liability insurance. It applies to residential, commercial, industrial, agricultural, institutional, and other property owners in the county.

Program details

Program ID
293
Last updated
8/15/2023

Eligibility

Sectors
commercial construction industrial local government nonprofit residential schools agricultural institutional
Technologies
wind (all) wind (small)

Program summary

In October 2004, the Rockingham County Board of Supervisors approved a zoning ordinance for small wind energy systems, the first of its kind in Virginia. Students at James Madison University drafted the original ordinance with guidance from members of the Virginia Wind Energy Collaborative (VWEC) and assistance from members of Rockingham County's planning board.

Although net metering is not required, the ordinance complements the state's net-metering regulations and requires compliance with the Uniform Statewide Building Code, FAA Regulations, National Electrical Code, and Virginia Regulations Governing Net Metering.

Other key provisions include:

  • Use of wind turbine must be primarily to reduce on-site electricity consumption.
  • Minimum parcel size of 1 acre.
  • Maximum height of 65 feet for parcels of land between 1 and 5 acres, and 80 feet for a parcel larger than five acres.
  • Setback from property lines of 110% of tower height and 150% setback from inhabited dwelling on neighboring property. These limits may be reduced with consent of the adjacent property owner.
  • Noise limit of 60 decibels at the closest property line.
  • Proof of liability insurance for system

Contact & resources

Contact email
milesjj@jmu.edu

Please verify current program details with the administering agency before making any financial decisions.

Keep looking

More programs in VA

Rebates, tax credits and loans often stack. Check what else applies before you buy.

Browse VA programs